Cheap PriceList for Epdm Waterproof Membrane - double component waterproof coating – Hongyuan Detail:
Double-component waterproofing coating
BiogoTM double-component waterproofing coating belongs to solidify waterproof materials, and the Group A is isocyanate terminated pre-polymer polycondensated by polyether and isocyanate, Group B is colored liquid composed of plasticizer, curing agent, thickening agents, coagulant agent and filler, ,ix Group A and B evenly as rate and brush on the waterproofing substrate surface, form a elastics and rubber-like coating film through cross-linking and solididying at normal temperature, which plays a role of waterproofing
Characteristic
l BiogoTM double-component waterproofing coating forms seamless, integrate elasticity waterproof layer solidifying, and improve waterproof and seeping resistance of the project, which is waterproof membrane that can not be attained. Especially the coating film has high elasticity and elongation, high adaptability to substrate craking or expansion.
l Firm bonding with substrate, coating film has extreme bonding power with concrete, timber, metal, pottery and asbestos shingle, also can be used as bond.
l Convenient application, polyurethane coating film is a cold application waterproof coating, just mix group A and B as rate when application and brush it on the waterproof substrate.
l Easy maintenance, only maintain the broken parts, which can reach the original effects of waterproofing, save time, save power and low cost.
l Environmental product, and reduce the damage to the person and environment.
Applicable scope
Widely used in roofs, basement, swimming pool, and all kinds of industry and civil building waterproofing.
Technical property [Execute standard GB/T19250-2003]
|
No. |
Item |
Index |
||
|
Ⅰ |
Ⅱ |
|||
|
1 |
Solid content%≥ |
92 |
||
|
2 |
Dry time of outside/inside h≤ |
Drying time of outside |
8 |
|
|
Drying time of inside |
24 |
|||
|
3 |
Tensile strength MPa≥ |
1.9 |
2.45 |
|
|
4 |
Fracture elongation%≥ |
450 |
450 |
|
|
5 |
Water impermeability 0.3MPa, 30min |
Impermeable |
||
|
6 |
Bending at low temperature℃≤ |
-35 |
||
|
7 |
Bonding strength of moist base a MPa≥ |
0.5 |
||
| a. only use the moist substrate of underground project. | ||||
Application technology
l Substrate need be firm, smooth, no sundries, inside corner and outside corner should be made into circular arc, the diameter of insider corner should be more than 50mm, and the outside corder
l Should be more than 10mm.;
Ingredient and dosage: according to application dosage, evenly mixing round o us.
l Reference dosage; coating film dosage is about 1.3-1.5kg/sqm when the thickness is 1mm.
Large waterproof application, coating uniformity mixed coating with a rubber or plastic scraper, the thickness is onsistent, generally it is 1.5mm to 2.0mm, should be brushed in 3 to 4 times, the last time brushing should be done after the pervious brushing cures and becomes film, and brushing at a ertical direction. Generally as a separate film-forming, for underground project board, should pave a layer of felt reinforced material in addition
Coating thickness: To underground project thickness is 1.2 to 2.0mm, generally 1.5mm; to toilet thickness is not less than 1.5mm; to multilayer waterproof of exposured roof construction thickness is not less than 1.2,,; to one layer waterproof of grade Ⅲ waterproof, thickness is not less than 2mm;
Finishing layer application: scatter the cleaned sand before the last time brushing is not solidified.
Protection layer: on the coating film surface should do insulation protection as the design.
Attention
l Diluent can’t be alcohol acid, nitro diluent such as paint thinner, don’t touch with water.
l Keep ventilate ration, mo fire.
l If the material has slight disposition, it should be evenly mixed before use
l The construction site must keep good ventilation and should not apply in rainy day;
l Open the cover when use, it must be use up in 40 minutes;
l If find broken coating film in construction site, dig around the broken opening with cutting knife, and then brush waterproofing coating and repair
Storage and attention items
l Keep materials in the room which is dry and ventilate ration
l Avoid direct sunlight when transportation, avoid collisions and pay attention to fire
l The guarantee period of storage is six months, the coating out of storage time should be used after rechecking
Product detail pictures:



Related Product Guide:
Industrial Floor Coatings Market to Hit $6 Billion by 2024: Global Market Insights, Inc. | Asphalt Shingle
Tricia Bishop: Heave ho, Pugh’s got to go | Other Views | Pvc Sheet Supplier
Fast and great quotations, informed advisers to help you choose the correct solution that suits all your requirements, a short creation time, responsible top quality manage and distinct providers for paying and shipping affairs for Cheap PriceList for Epdm Waterproof Membrane - double component waterproof coating – Hongyuan, The product will supply to all over the world, such as: Tunisia, Swaziland, Hanover, Abiding by our motto of "Hold well the quality and services, Customers Satisfaction", So we provide our clients with high quality products and excellent service. Please feel free to contact us for further information.
The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
-
Cheap PriceList for Epdm Waterproof Membrane -...
-
Factory made hot-sale Waterproofing Supply - R...
-
Free sample for Single-Ply Roofing Membrane - ...
-
Wholesale Discount Polyurethane Liquid Waterpro...
-
Top Quality Roof Waterproof Membrane - Spray P...
-
2017 New Style Water Base Polyurethane Waterpro...