Discount Price Epdm High Frictional Rubber Sheet - double component waterproof coating – Hongyuan

Short Description:

Double-component waterproofing coatingBiogoTM double-component waterproofing coating belongs to solidify waterproof materials, and the Group A is isocyanate terminated pre-polymer polycondensated by polyether and isocyanate, Group B is colored liquid composed of plasticizer, curing agent, thicke...


Product Detail

Product Tags

Related Video

Feedback (2)

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate in our success for Hdpe Self-Adhesive Membrane, Water Liquild Rubber Membrane, Wet Areas Waterproofing, If you are interested in any of our products or would like to discuss a customized order, please feel free to contact us.
Discount Price Epdm High Frictional Rubber Sheet - double component waterproof coating – Hongyuan Detail:

Double-component waterproofing coating

BiogoTM double-component waterproofing coating belongs to solidify waterproof materials, and the Group A is isocyanate terminated pre-polymer polycondensated by polyether and isocyanate, Group B is colored liquid composed of plasticizer, curing agent, thickening agents, coagulant agent and filler, ,ix Group A and B evenly as rate and brush on the waterproofing substrate surface, form a elastics and rubber-like coating film through cross-linking and solididying at normal temperature, which plays a role of waterproofing

Characteristic

l  BiogoTM  double-component waterproofing coating forms seamless, integrate elasticity waterproof layer solidifying, and improve waterproof and seeping resistance of the project, which is waterproof membrane that can not be attained. Especially the coating film has high elasticity and elongation, high adaptability to substrate craking or expansion.

l  Firm bonding with substrate, coating film has extreme bonding power with concrete, timber, metal, pottery and asbestos shingle, also can be used as bond.

l  Convenient application, polyurethane coating film is a cold application waterproof coating, just mix group A and B as rate when application and brush it on the waterproof substrate.

l  Easy maintenance, only maintain the broken parts, which can reach the original effects of waterproofing, save time, save power and low cost.

l  Environmental product, and reduce the damage to the person and environment.

Applicable scope

Widely used in roofs, basement, swimming pool, and all kinds of industry and civil building waterproofing.

Technical property                           [Execute standard GB/T19250-2003]

No.

Item

Index

1

Solid content%≥

92

2

Dry time of outside/inside h≤

Drying time of outside

8

Drying time of inside

24

3

Tensile strength MPa≥

1.9

2.45

4

Fracture elongation%≥

450

450

5

Water impermeability 0.3MPa, 30min

Impermeable

6

Bending at low temperature℃≤

-35

7

Bonding strength of moist base a MPa≥

0.5

a. only use the moist substrate of underground project.

Application technology

l  Substrate need be firm, smooth, no sundries, inside corner and outside corner should be made into circular arc, the diameter of insider corner should be more than 50mm, and the outside corder

l  Should be more than 10mm.;

Ingredient and dosage: according to application dosage, evenly mixing round o us.

l  Reference dosage; coating film dosage is about 1.3-1.5kg/sqm when the thickness is 1mm.

Large waterproof application, coating uniformity mixed coating with a rubber or plastic scraper, the thickness is onsistent, generally it is 1.5mm to 2.0mm, should be brushed in 3 to 4 times, the last time brushing should be done after the pervious brushing cures and becomes film, and brushing at a ertical direction. Generally as a separate film-forming, for underground project board, should pave a layer of felt reinforced material in addition

Coating thickness: To underground project thickness is 1.2 to 2.0mm, generally 1.5mm; to toilet thickness is not less than 1.5mm; to multilayer waterproof of exposured roof construction thickness is not less than 1.2,,; to one layer waterproof of grade Ⅲ waterproof, thickness is not less than 2mm;

Finishing layer application: scatter the cleaned sand before the last time brushing is not solidified.

Protection layer: on the coating film surface should do insulation protection as the design.

Attention

l  Diluent can’t be alcohol acid, nitro diluent such as paint thinner, don’t touch with water.

l  Keep ventilate ration, mo fire.

l  If the material has slight disposition, it should be evenly mixed before use

l  The construction site must keep good ventilation and should not apply in rainy day;

l  Open the cover when use, it must be use up in 40 minutes;

l  If find broken coating film in construction site, dig around the broken opening with cutting knife, and then brush waterproofing coating and repair

Storage and attention items

l  Keep materials in the room which is dry and ventilate ration

l  Avoid direct sunlight when transportation, avoid collisions and pay attention to fire

l  The guarantee period of storage is six months, the coating out of storage time should be used after rechecking

 


Product detail pictures:

Discount Price Epdm High Frictional Rubber Sheet - double component waterproof coating – Hongyuan detail pictures

Discount Price Epdm High Frictional Rubber Sheet - double component waterproof coating – Hongyuan detail pictures

Discount Price Epdm High Frictional Rubber Sheet - double component waterproof coating – Hongyuan detail pictures


Related Product Guide:
El Paso is second among Colorado’s stormiest counties | Epdm Swimming Pool
Global Waterproofing Chemicals Market Latest Developments, Product Classification For A Decade From 2018 to 2027 Industry Forecast | Asphalt Shingle

Our solutions are widely recognized and trusted by consumers and will meet up with constantly developing financial and social requires for Discount Price Epdm High Frictional Rubber Sheet - double component waterproof coating – Hongyuan, The product will supply to all over the world, such as: Doha, Kenya, Ethiopia, Our qualified engineering team will usually be prepared to serve you for consultation and feedback. We've been able to also deliver you with absolutely free samples to meet your needs. Best efforts might be made to offer you the ideal service and items. For anyone who is interested in our company and products, be sure to make contact with us by sending us emails or contact us right away. In order to know our solutions and organization. ar more, you can come to our factory to determine it. We are about to usually welcome guests from around the globe to our corporation. o create small business relations with us. Please genuinely feel no cost to speak to us for enterprise. nd we believe we have been gonna share the most effective trading practical experience with all our merchants.
  • As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Betsy from Brisbane - 2015.09.16 11:31
    Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Candy from Moscow - 2015.07.27 12:26
    WhatsApp Online Chat !